On this page · 10 sections
How to Price a Cabinet Job
Per linear foot, per box, or cost-plus, and when each one fits
CabinetBuilder.ai · Updated · 9 min read
A cabinet price has to do two jobs. It has to be quick enough to give a homeowner a number on the first call, and accurate enough that the job still pays when you build it. No single method does both, which is why most shops use two.
Per linear foot
Pricing by the linear foot means measuring the run of cabinets along the wall and multiplying by a rate. Shops usually keep separate rates for base, upper and tall cabinets, because a foot of tall pantry has far more material in it than a foot of uppers.
It is fast and easy for customers to compare. Its weakness is that a foot is not a fixed amount of work. A foot of drawer bank costs more than a foot of plain doors, and a corner lazy susan costs more than either. Shops that price only by the foot tend to lose money on drawer-heavy kitchens and win the easy ones.
Use it for a ballpark on the phone. Say so when you give it.
Per box
Pricing per cabinet (per box) gives each cabinet type its own price: a 30″ sink base, an 18″ drawer base, a 36″ upper. A job is the sum of its boxes plus doors, finish, trim and install.
This tracks the real work much better than linear feet, because a drawer base carries its drawer cost wherever it goes. It takes longer to build the price list, and the list goes stale when sheet goods or hardware move.
Itemized cost-plus
Cost-plus prices the job from what it takes to build it. It is the method that tells you whether a quote makes money.
Add up materials
List every sheet, solid wood board, edge banding roll, hinge, slide and pull the job uses, priced at what you pay today. Sheet count comes from the sheet layout, not from guessing square feet: offcuts are real cost.
Estimate labor hours
Estimate the hours to cut, band, machine, assemble, finish and install, then multiply by a shop rate. Your shop rate is what an hour of shop time costs you, wages and burden included. Count parts, not cabinets: an inset door takes longer to fit than an overlay one, and a drawer is more work than a door.
Cover overhead
Rent, power, insurance, tool wear, software and your time spent quoting all have to come from jobs. Add them as a percentage on top of materials and labor, or build them into the shop rate. Pick one so you do not count them twice.
Add your margin
Margin is the share of the price that is profit. Markup is what you add to cost. They are not the same number, and mixing them up is the most common pricing mistake in small shops.
| You want | Price is | On a $10,000 cost |
|---|---|---|
| 30% markup | cost × 1.30 | $13,000 (23% margin) |
| 30% margin | cost ÷ 0.70 | $14,286 |
The example numbers are only for the arithmetic. Your own costs set your price.
A worked example
Take the L-shaped kitchen example: a corner lazy susan, a hood over the range and crown on the uppers. Priced per linear foot, the corner and the drawer bases cost the same as plain doors. Priced cost-plus, the sheet layout says how many sheets the boxes need, the hardware list counts the slides and hinges, and the part count drives the labor estimate. The two prices can be far apart, and the cost-plus one is the one that is true.
Keep the price tied to the design
Prices drift when the quote is a spreadsheet and the design lives somewhere else. Change a run in the drawing and the spreadsheet does not know.
Common mistakes
- One linear-foot rate for everything. Keep separate base, upper and tall rates at least.
- Square feet instead of sheets. You buy whole sheets.
- Forgetting the deposit. Ask for enough up front to buy materials. Many shops split a job into deposit, delivery and install payments.
- Pricing hardware at retail one job and wholesale the next. Keep one price list and update it.
- Treating markup as margin. See the table above.